DocumentCode
117202
Title
An ordered approach to Minimum Completion Time in unrelated parallel-machines for the makespan optimization
Author
Serra Santos, Andre ; Madureira, A.M. ; Varela, M.L.R.
Author_Institution
Dept. of Production & Syst., Univ. of Minho, Guimaraes, Portugal
fYear
2014
fDate
July 30 2014-Aug. 1 2014
Firstpage
72
Lastpage
77
Abstract
In the current global market organizations face uncertainties and shorter response time. In order to remain competitive many organizations adopted flexible resources capable of performing several operations with different performance capabilities. The unrelated parallel-machines makespan minimization problem (Rm∥Cmax) is known to be NP-hard or too complex to be solved exactly. Among the several heuristics used for solving this problem, it is possible to identify MCT (Minimum Completion Time) that allocates tasks in a random order to the minimum completion time machine. This paper proposes an ordered approach to the MCT heuristic. MOMCT (Modified Ordered Minimum Completion Time), which will order tasks in accordance to the mean difference of the completion time on each machine and the minimum completion time machine. The computational study demonstrated the improved performance of the proposed ordered approach to the MCT heuristic.
Keywords
computational complexity; optimisation; parallel machines; MOMCT; NP-hard problem; Rm∥Cmax; modified ordered minimum completion time; unrelated parallel-machines makespan optimization; Face; MCT; MOMCT; Makespan; Scheduling; Unrelated Parallel Machines;
fLanguage
English
Publisher
ieee
Conference_Titel
Nature and Biologically Inspired Computing (NaBIC), 2014 Sixth World Congress on
Conference_Location
Porto
Print_ISBN
978-1-4799-5936-5
Type
conf
DOI
10.1109/NaBIC.2014.6921856
Filename
6921856
Link To Document