B.C. Hydro Series Capacitor Bank Staged Fault Test
Author
Mansour, Y. ; Martinich, T.G. ; Drakos, J.E.
Author_Institution
B.C. Hydro
Issue
7
fYear
1983
fDate
7/1/1983 12:00:00 AM
Firstpage
1960
Lastpage
1969
Abstract
A staged phase-to-phase fault was applied to one end of a 500 kV series compensated circuit as part of the specified acceptance tests for the series capacitor bank. This paper summarizes the pre-test planning studies, test execution, and the results of both the staged fault test and its computer simulations for the third series capacitor bank installed at the B.C. Hydro Kennedy Substation. Stability and electromagnetic transients simulations are invaluable for the planning of major system tests and pre-test transients simulations are able to accurately predict test results.
Keywords
Capacitors; Circuit faults; Circuit stability; Circuit testing; Computational modeling; Computer simulation; Electromagnetic transients; Predictive models; Substations; System testing;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1983.318181
Filename
4112171
Link To Document