• DocumentCode
    1172388
  • Title

    Reliability Modelling of Thermal Units for Peaking and Cycling Operations

  • Author

    Wang, L. ; Ramani, N. ; Davies, T.C.

  • Author_Institution
    Ontario Hydro
  • Issue
    7
  • fYear
    1983
  • fDate
    7/1/1983 12:00:00 AM
  • Firstpage
    2004
  • Lastpage
    2011
  • Abstract
    The four-state Markov model for peaking units recommended in 1972 by an IEEE Task Group is modified to provide a more accurate representation of the operating history of thermal units in cycling operations. Two new models are also presented: one for identifying contributions to the calculated index from the various causes of outages, the other for incorporating the forced extensions of planned outages separately instead of lumping them with forced outages. Finally, a general method is proposed for estimating the transition rates of Markov models from recorded data.
  • Keywords
    Capacity planning; Force measurement; History; Job shop scheduling; Power & Energy Society; Power engineering and energy; Power system modeling; Printing; Reliability; Systems engineering and theory;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1983.318186
  • Filename
    4112176