DocumentCode
1172927
Title
Power-system control¿the CEGB´s plans
Author
Pulsford, H.E. ; Gunning, P.F.
Volume
13
Issue
7
fYear
1967
fDate
7/1/1967 12:00:00 AM
Firstpage
245
Lastpage
249
Abstract
The Central Electricity Generating Board´s 2-tier control system is being reinforced by the installation of ´district´ control rooms and new area control rooms at the existing control centres, and by a new national control centre in London with computer-controlled selective electronic display. The changeover to 3-tier operation will be complete in 1968-69.
Keywords
digital computers; electrical power systems;
fLanguage
English
Journal_Title
Electronics and Power
Publisher
iet
ISSN
0013-5127
Type
jour
DOI
10.1049/ep.1967.0170
Filename
5178321
Link To Document