Title :
Long Range Generation Planning With Limited Energy and Storage Plants Part I: Production Costing
Author :
Bloom, Jeremy A. ; Charny, Leonid
Author_Institution :
General Public Utilities Service Corporation
Issue :
9
fYear :
1983
Firstpage :
2861
Lastpage :
2870
Abstract :
Generalized Benders´ decomposition has been proposed as the basis for a new model for long range generation planning integrating linear programming with probabilistic methods for production costing and reliability calculations. The original formulation of this model is suitable only for power systems in which all generators are of the thermal type, which can produce unlimited energy. In modeling real utility systems, it is often necessary to include limited energy plants and storage plants. Modeling these technologies requires modifying both the master problem and the subproblems of the generalized Benders´ model. The production costing subproblems require extensive changes, particularly to determine the proper loading order positions for plants of these types and to implement new formulas to compute the dual multipliers. Significant advances in this work include the discovery of energy invariance properties which reduce substantially the computation required and a new treatment of the manner in which charging storage units modify the equivalent load duration curves. Modifications of the production costing subproblem are described in this paper. A sequel, Part II, describes the modifications necessary in the master problem linear program.
Keywords :
Costing; Costs; Energy storage; Hydroelectric power generation; Mathematical model; Meeting planning; Power system modeling; Power system planning; Power system reliability; Production planning;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1983.318167
Filename :
4112293
Link To Document :
بازگشت