• DocumentCode
    1173732
  • Title

    Outline Of The 100 kw Otec Pilot Plant In The Republic Of Naure

  • Author

    Mitsui, Tsuneo ; Ito, Fumio ; Seya, Yutaka ; Nakamoto, Yasunobu

  • Author_Institution
    Tokyo Electric Power Co., Inc.
  • Issue
    9
  • fYear
    1983
  • Firstpage
    3167
  • Lastpage
    3171
  • Abstract
    A 100 kW OTEC pilot plant was constructed for demonstration purposes in the Republic of Nauru and began, in October 1981, to send electricity to the real power system. The main points of the plan, design and technical considerations are introduced as well as the operation results up to date. This pilot plant operation has proved the validity of the electrical and mechanical design, and the underwater pipeline laying method in the field of ocean-civil engineering.
  • Keywords
    Indium tin oxide; Ocean temperature; Pipelines; Power generation; Power generation economics; Power systems; Sea surface; Surface topography; System testing; Turbines;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1983.318124
  • Filename
    4112327