DocumentCode
1173807
Title
Excessive Shaft Throw Problem Of Generators For Kpong Generating Station, VRA, Ghana
Author
Okazaki, Shin-ichi ; Nakano, Fujio
Author_Institution
Toshiba Corporation
Issue
9
fYear
1983
Firstpage
3226
Lastpage
3231
Abstract
The generators which have been delivered to the Kpong, Hydroelectric Project, owned by the Volta River Authority (VRA) of Ghana, are very low speed and large diameter machines.
Keywords
Circuit testing; Force measurement; Hydroelectric power generation; Magnetic forces; Magnetic heads; Rotors; Shafts; Stators; Turbines; Voltage;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1983.318133
Filename
4112336
Link To Document