• DocumentCode
    1174045
  • Title

    Time Frame Notion and Time Response of the Models in Transient, Mid-Term and Long-Term Stability Programs

  • Author

    Cate, Esko G. ; Hemmaplardh, K. ; Manke, Joseph W. ; Gelopulos, D.P.

  • Author_Institution
    Energy Technology Applications Division Boeing Computer Services Company
  • Issue
    1
  • fYear
    1984
  • Firstpage
    143
  • Lastpage
    151
  • Abstract
    There is considerable interest in expanding the capability of transient stability simulation to extend the time range of simulation and to add more power system components. The EPRI projects RP 745 and RP 1208 extended transient stability simulation to the mid-and long-term range. Additional power system components have added both high-speed dynamics (dc converters, generator subtransients) and very low speed effects (boiler dynamics, AGC controls). This paper addresses the interfacing of the wide range of time frames. A measure of the time frames is defined and evaluated for power system components in the EPRI RP 1208 Transient/Midterm Stability Program. The limitations and capabilities of stability simulation to properly support the range of time frames is discussed. This work has been supported, in part, by EPRI projects RP 745, RP 1208 and RP 1469.
  • Keywords
    DC generators; DC-DC power converters; Power generation; Power system dynamics; Power system measurements; Power system modeling; Power system simulation; Power system stability; Power system transients; Time factors;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1984.318592
  • Filename
    4112363