• DocumentCode
    1175805
  • Title

    Cost of transmission transactions: an introduction

  • Author

    Shirmohammadi, Dariush ; Rajagopalan, Chithra ; Alward, Eugene R. ; Thomas, Chifong L.

  • Author_Institution
    Pacific Gas & Electr. Co., San Francisco, CA, USA
  • Volume
    6
  • Issue
    3
  • fYear
    1991
  • fDate
    8/1/1991 12:00:00 AM
  • Firstpage
    1006
  • Lastpage
    1016
  • Abstract
    Major technical issues are discussed related to the cost of transmission transactions provided by a vertically integrated electric utility company. The authors identify the components of the cost of a transmission transaction and present methodologies for evaluating them using simple examples. The major cost components of a transmission transaction are: operating cost; opportunity cost; reinforcement cost; and existing system cost. The evaluation of these components requires the development of new analytical and knowledge-based techniques
  • Keywords
    economics; electricity supply industry; transmission networks; existing system cost; operating cost; opportunity cost; reinforcement cost; transmission transactions; vertically integrated electric utility company; Costing; Costs; Guidelines; North America; Power engineering and energy; Power generation economics; Power system economics; Power systems; Pricing; Senior members;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/59.119240
  • Filename
    119240