DocumentCode
1176031
Title
Summary of panel: long term impact of third-party transmission use
Author
Adamson, A.M. ; Garver, L.L. ; Maughn, J.N. ; Palermo, P.J. ; Stillinger, W.L.
Author_Institution
New York Power Pool, Schenectady, NY, USA
Volume
6
Issue
3
fYear
1991
fDate
8/1/1991 12:00:00 AM
Firstpage
1183
Lastpage
1188
Abstract
The comments made by the five panel participants at the winter 1989 IEEE Power Engineering Society meeting are summarized. The speakers emphasized the changing role of transmission as a delivery mechanism for power belonging to many users. The increased competition between owners of transmission, which also happen to be owners of generation, make sharing of information, which is necessary to understand transmission bottlenecks, more difficult. The transmission aspects of electric utility planning are becoming more challenging because they are more complex
Keywords
power transmission; electric utility planning; third-party transmission use; transmission aspects; transmission bottlenecks; winter 1989 IEEE Power Engineering Society; Contracts; Corporate acquisitions; Industrial power systems; Meeting planning; Power engineering and energy; Power markets; Power system management; Power system planning; Power system reliability; Systems engineering and theory;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/59.119264
Filename
119264
Link To Document