• DocumentCode
    1176069
  • Title

    A heuristic short-term unit commitment

  • Author

    Tong, S.K. ; Shahidehpour, S.M. ; Ouyang, Z.

  • Author_Institution
    Control Data Corp., Minneapolis, MN, USA
  • Volume
    6
  • Issue
    3
  • fYear
    1991
  • fDate
    8/1/1991 12:00:00 AM
  • Firstpage
    1210
  • Lastpage
    1216
  • Abstract
    A heuristic approach to the unit commitment problem is considered. The proposed algorithm uses priority list based heuristics in the form of inference rules to find a suboptimal schedule for a given load pattern. The new schedule is a modified and locally optimized version of an existing schedule that is retrieved from the system database. The global optimization can be performed as an inference process once the suboptimal solution is obtained. A prototype system is developed and tested on an IBM-PC under the EASE+NEXPERT shell and the C language. The performance of the system demonstrates the real-time processing capability and the effectiveness of the proposed system, particularly for short-term unit commitment
  • Keywords
    expert systems; inference mechanisms; microcomputer applications; power system analysis computing; scheduling; C language; EASE plus NEXPERT shell; IBM-PC; database; global optimization; heuristic short-term unit commitment; inference rules; load pattern; real-time processing; suboptimal schedule; Dynamic programming; Expert systems; Humans; Mathematical programming; Optimal scheduling; Power system dynamics; Power system restoration; Power system security; Power systems; Senior members;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/59.119268
  • Filename
    119268