DocumentCode
1176069
Title
A heuristic short-term unit commitment
Author
Tong, S.K. ; Shahidehpour, S.M. ; Ouyang, Z.
Author_Institution
Control Data Corp., Minneapolis, MN, USA
Volume
6
Issue
3
fYear
1991
fDate
8/1/1991 12:00:00 AM
Firstpage
1210
Lastpage
1216
Abstract
A heuristic approach to the unit commitment problem is considered. The proposed algorithm uses priority list based heuristics in the form of inference rules to find a suboptimal schedule for a given load pattern. The new schedule is a modified and locally optimized version of an existing schedule that is retrieved from the system database. The global optimization can be performed as an inference process once the suboptimal solution is obtained. A prototype system is developed and tested on an IBM-PC under the EASE+NEXPERT shell and the C language. The performance of the system demonstrates the real-time processing capability and the effectiveness of the proposed system, particularly for short-term unit commitment
Keywords
expert systems; inference mechanisms; microcomputer applications; power system analysis computing; scheduling; C language; EASE plus NEXPERT shell; IBM-PC; database; global optimization; heuristic short-term unit commitment; inference rules; load pattern; real-time processing; suboptimal schedule; Dynamic programming; Expert systems; Humans; Mathematical programming; Optimal scheduling; Power system dynamics; Power system restoration; Power system security; Power systems; Senior members;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/59.119268
Filename
119268
Link To Document