  • Abstract
    Probability methods have been applied to schedule generating unit maintenance in single systems. Many utilities are now firmly interconnected with neighbouring utilities and generating capacity planning is conducted on a fully or semi-integrated basis. This paper presents a method based on the Gram-Charlier expansion for evaluating maintenance schedules in two interconnected power utilities using a levelized reliability criterion. This paper also investigates the effect of changing one utility peak demand on the maintenance schedule of the other utility. It also investigates the influence of tie capacity on the maintenance schedule of both utilities. An extention to the concept of the effective load carrying capability (ELCC) of a unit from single to two interconnected systems has been illustrated in this paper. Although the method has been applied to two interconnected systems, there are no conceptual difficulties in extending it to multi-interconnected systems.
  • Keywords
    Interconnected systems; Maintenance; Power & Energy Society; Power engineering and energy; Power generation; Power system interconnection; Power system reliability; Processor scheduling; Samarium; Systems engineering and theory;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1984.318709
  • Filename
    4112626