Generating Unit Maintenance Scheduling for Single and Two Interconnected Systems
Author
El-Sheikhi, Farag A. ; Billinton, Roy
Author_Institution
Power System Research Group University of Saskatchewan
Issue
5
fYear
1984
fDate
5/1/1984 12:00:00 AM
Firstpage
1038
Lastpage
1044
Abstract
Probability methods have been applied to schedule generating unit maintenance in single systems. Many utilities are now firmly interconnected with neighbouring utilities and generating capacity planning is conducted on a fully or semi-integrated basis. This paper presents a method based on the Gram-Charlier expansion for evaluating maintenance schedules in two interconnected power utilities using a levelized reliability criterion. This paper also investigates the effect of changing one utility peak demand on the maintenance schedule of the other utility. It also investigates the influence of tie capacity on the maintenance schedule of both utilities. An extention to the concept of the effective load carrying capability (ELCC) of a unit from single to two interconnected systems has been illustrated in this paper. Although the method has been applied to two interconnected systems, there are no conceptual difficulties in extending it to multi-interconnected systems.
Keywords
Interconnected systems; Maintenance; Power & Energy Society; Power engineering and energy; Power generation; Power system interconnection; Power system reliability; Processor scheduling; Samarium; Systems engineering and theory;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1984.318709
Filename
4112626
Link To Document