DocumentCode :
1177234
Title :
Equipment Qualification: The Process for New Plants as Seen by a Utility
Author :
Porter, Newell S.
Author_Institution :
Washington Public Power Supply System
Issue :
7
fYear :
1984
fDate :
7/1/1984 12:00:00 AM
Firstpage :
1654
Lastpage :
1655
Abstract :
The qualification process, based on the experience an electric utility gained through its efforts to meet the requirements of IEEE Standards 627-80 and 323-1974 and the attendant regulatory guidance for new plants, is presented. Important aspects of each step from initial plant design to maintaining equipment qualification during operations are described. Although all these steps are not directly applicable to near-term and operating plants, the guidance offered is generally appropriate for procurement of qualified spare and replacement parts and for plant modifications of safety systems.
Keywords :
Design engineering; Nuclear power generation; Power generation; Power industry; Power supplies; Procurement; Qualifications; Safety devices; Senior members; Testing;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1984.318648
Filename :
4112725
Link To Document :
بازگشت