DocumentCode
1177457
Title
Re-evaluation of superheat conditions postulated in NRC Information Notice 84-90 [nuclear plant]
Author
Alsammarae, Aiham ; Kruger, Doug ; Beutel, Doug ; Spisak, Mike
Author_Institution
Commonwealth Edison Co., Chicago, IL, USA
Volume
41
Issue
4
fYear
1994
fDate
8/1/1994 12:00:00 AM
Firstpage
1389
Lastpage
1393
Abstract
Information Notice 84-90, “Main Steam Line Break Effect on Environmental Qualification of Equipment”, describes a potential problem regarding existing plant analyses and equipment qualification (EQ) related to a postulated main steam line break (MSLB) with releases of superheated steam. This notice states that certain methodologies for computing mass and energy releases for a postulated MSLB did not account for heat transfer from the steam generator tube bundles if they were uncovered. Due to this potential change in the original environmental analysis, the EQ of various components may not consider the thermal environment which could result from superheated steam. Subsequent technical assessments may determine that the existing qualification basis for equipment/components does not envelop the postulated superheat condition. Corrective actions need to be taken to demonstrate that the affected equipment is qualified. The purpose of this paper is to describe the technical re-assessment of the MSLB/superheat condition
Keywords
accidents; fission reactor cooling and heat recovery; fission reactor safety; heat transfer; NRC Information Notice 84-90; equipment qualification; main steam line break; nuclear plant; superheat; superheated steam; Accidents; Heat transfer; Information analysis; Licenses; Nuclear power generation; Qualifications; Temperature dependence;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/23.322920
Filename
322920
Link To Document