Application of Partial Discharge Testing to Hydro Generator Maintenance
Author :
Kurtz, M. ; Lyles, J.F. ; Stone, G.C.
Author_Institution :
Ontario Hydro
Issue :
8
fYear :
1984
Firstpage :
2148
Lastpage :
2157
Abstract :
An improved partial discharge test to ascertain hydraulic generator winding condition, has been in use for the last 7 years. The test, which can be done by generating station staff without disrupting operation, has been applied to about 140 machines in eight North American utilities. Partial discharge testing is one of the main reasons Ontario Hydro has an exceptionally low winding replacement/major repair rate. Examples of results culled from thousands of tests are presented.. The use of the partial discharge test for planning winding maintenanGe and gauging the effectiveness of repairs is discussed.
Keywords :
Capacitors; Circuit testing; Costs; Couplers; Differential amplifiers; Insulation; Partial discharges; Stator windings; Thermal stresses; Voltage;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1984.318525
Filename :
4112799
Link To Document :
بازگشت