• DocumentCode
    1177899
  • Title

    Application of Partial Discharge Testing to Hydro Generator Maintenance

  • Author

    Kurtz, M. ; Lyles, J.F. ; Stone, G.C.

  • Author_Institution
    Ontario Hydro
  • Issue
    8
  • fYear
    1984
  • Firstpage
    2148
  • Lastpage
    2157
  • Abstract
    An improved partial discharge test to ascertain hydraulic generator winding condition, has been in use for the last 7 years. The test, which can be done by generating station staff without disrupting operation, has been applied to about 140 machines in eight North American utilities. Partial discharge testing is one of the main reasons Ontario Hydro has an exceptionally low winding replacement/major repair rate. Examples of results culled from thousands of tests are presented.. The use of the partial discharge test for planning winding maintenanGe and gauging the effectiveness of repairs is discussed.
  • Keywords
    Capacitors; Circuit testing; Costs; Couplers; Differential amplifiers; Insulation; Partial discharges; Stator windings; Thermal stresses; Voltage;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1984.318525
  • Filename
    4112799