Application of Partial Discharge Testing to Hydro Generator Maintenance
Author
Kurtz, M. ; Lyles, J.F. ; Stone, G.C.
Author_Institution
Ontario Hydro
Issue
8
fYear
1984
Firstpage
2148
Lastpage
2157
Abstract
An improved partial discharge test to ascertain hydraulic generator winding condition, has been in use for the last 7 years. The test, which can be done by generating station staff without disrupting operation, has been applied to about 140 machines in eight North American utilities. Partial discharge testing is one of the main reasons Ontario Hydro has an exceptionally low winding replacement/major repair rate. Examples of results culled from thousands of tests are presented.. The use of the partial discharge test for planning winding maintenanGe and gauging the effectiveness of repairs is discussed.
Keywords
Capacitors; Circuit testing; Costs; Couplers; Differential amplifiers; Insulation; Partial discharges; Stator windings; Thermal stresses; Voltage;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1984.318525
Filename
4112799
Link To Document