• DocumentCode
    1178289
  • Title

    Bulb Turbine/Generators for the Idaho Falls Hudroelectric Project

  • Author

    Paine, J.S. ; Felton, L.E.

  • Author_Institution
    CITY OF IDAHO FALLS
  • Issue
    9
  • fYear
    1984
  • Firstpage
    2405
  • Lastpage
    2409
  • Abstract
    Bulb turbines were used to rehabilitate three hydroelectric projects owned and operated by the City of Idaho Falls in Southeastern Idaho. The projects all have gross heads of approximately 5.8 meters (19 ft.) and are designed to utilize a flow of 170 cms (6,000 cfs). Because of the similarities of the sites, economy was achieved by purchase of three identical eight (8) megawatt units and designing each power- house the same. The physical arrangement of the structures differ slightly due to the variations in site geographies. Each plant is remotely operated and unmanned.
  • Keywords
    Cities and towns; Collision mitigation; Erbium; Geography; Hydraulic turbines; Hydroelectric power generation; Magnetic heads; Power generation economics; Rivers; Shafts;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1984.318391
  • Filename
    4112840