DocumentCode :
1180469
Title :
Avoided costs: Ontario Hydro´s experience
Author :
Shalaby, Amir
Author_Institution :
Ontario Hydro, Ont., Canada
Volume :
4
Issue :
1
fYear :
1989
fDate :
2/1/1989 12:00:00 AM
Firstpage :
149
Lastpage :
157
Abstract :
Ontario Hydro regularly estimates avoided costs primarily for use in evaluating some design, operating, planning, and domestic marketing alternatives. Avoided costs reflect the expected cost of increased or decreased use of existing facilities or the expected cost of delaying or advancing additional resources. The author explains how Ontario Hydro calculates avoided costs. He includes a brief review of various methods proposed for calculating them. He refers to the theoretical basis for the methods used and lists in detail the assumptions used by Ontario Hydro
Keywords :
economics; electricity supply industry; Ontario Hydro; avoided costs estimation; design; marketing; operation; planning; Costs; Electric variables measurement; Electricity supply industry; Nuclear facility regulation; Petroleum; Power generation; Printing; Production; Propagation losses; Voltage;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.32472
Filename :
32472