• DocumentCode
    1180469
  • Title

    Avoided costs: Ontario Hydro´s experience

  • Author

    Shalaby, Amir

  • Author_Institution
    Ontario Hydro, Ont., Canada
  • Volume
    4
  • Issue
    1
  • fYear
    1989
  • fDate
    2/1/1989 12:00:00 AM
  • Firstpage
    149
  • Lastpage
    157
  • Abstract
    Ontario Hydro regularly estimates avoided costs primarily for use in evaluating some design, operating, planning, and domestic marketing alternatives. Avoided costs reflect the expected cost of increased or decreased use of existing facilities or the expected cost of delaying or advancing additional resources. The author explains how Ontario Hydro calculates avoided costs. He includes a brief review of various methods proposed for calculating them. He refers to the theoretical basis for the methods used and lists in detail the assumptions used by Ontario Hydro
  • Keywords
    economics; electricity supply industry; Ontario Hydro; avoided costs estimation; design; marketing; operation; planning; Costs; Electric variables measurement; Electricity supply industry; Nuclear facility regulation; Petroleum; Power generation; Printing; Production; Propagation losses; Voltage;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/59.32472
  • Filename
    32472