• DocumentCode
    1181145
  • Title

    Air Cycle Cooling System for HPOF Cables-Waltz Mill Tests

  • Author

    Burghardt, R.R. ; Cooper, J.H.

  • Author_Institution
    Westinghouse Electric Corporation
  • Issue
    4
  • fYear
    1985
  • fDate
    7/1/1985 12:00:00 AM
  • Firstpage
    761
  • Lastpage
    767
  • Abstract
    A prototype air cycle cooling system, designed for forced cooling of HPOF pipe-type cable, was built under an EPRI contract. Its main components are a turbine and compressor operated on a single high speed shaft and a compact cable. oil to air heat exchanger. Air cooling is supplemented by a spray water system. Tests were conducted on the prototype unit at the EPRI Waltz Mill Cable Test Facility to evaluate its performance and operating characteristics. This paper briefly describes this equipment and presents the results of the test program.
  • Keywords
    Contracts; Cooling; Milling machines; Oil filled cables; Petroleum; Prototypes; Shafts; Spraying; System testing; Turbines;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1985.319071
  • Filename
    4113151