Unit reliability measures for power plants facing partial outages and variable demand
Author
Ganor, Michael ; Zahavi, Jacob
Volume
4
Issue
3
fYear
1989
fDate
8/1/1989 12:00:00 AM
Firstpage
862
Lastpage
869
Abstract
Unit reliability measures are evaluated for power plants facing partial outages and variable demand. The problem is formulated as an embedded Markov chain, and several reliability criteria are developed for a three-state unit with generally distributed demand periods and exponentially distributed operation and repair times. The model developed is applied to a sample unit using realistic data to estimate the demand, no-demand, up-time and down-time distributions
Keywords
Markov processes; power stations; reliability; demand; embedded Markov chain; model; partial outages; power plants; power stations; reliability; repair; Costs; Energy management; Jacobian matrices; Measurement units; Power generation; Power measurement; Power system measurements; Power system modeling; Power system reliability; Power system simulation;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/59.32573
Filename
32573
Link To Document