• DocumentCode
    1181390
  • Title

    Effects of Large Cyclic Six-Pulse Thyristor Loads on a Rural Distribution System: A Case History

  • Author

    Angell, D.H.

  • Author_Institution
    Power Engineers, Inc.
  • Issue
    4
  • fYear
    1985
  • fDate
    7/1/1985 12:00:00 AM
  • Firstpage
    965
  • Lastpage
    970
  • Abstract
    This paper describes the impact of a large cyclical mining load employing six-pulse thyristor bridge rectifiers upon a rural distribution system. The thyristor bridge rectifiers are utilized on dc driven excavators in the mine. An analysis of voltage flicker and harmonics on the distribution system is presented with the resulting operating experience. Use of diesel generation is shown as a method of reducing voltage flicker.
  • Keywords
    Bridge circuits; History; Power industry; Power supplies; Power system harmonics; Rectifiers; Substations; Telephony; Thyristors; Voltage fluctuations;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1985.319098
  • Filename
    4113179