DocumentCode :
1181467
Title :
Computer configuration for Ontario Hydro´s new energy management system
Author :
Barrie, D. ; Hill, D.S. ; Yuen, A.
Author_Institution :
Ontario Hydro, Toronto, Ont., Canada
Volume :
4
Issue :
3
fYear :
1989
fDate :
8/1/1989 12:00:00 AM
Firstpage :
927
Lastpage :
934
Abstract :
In 1985, Ontario Hydro decided to build a system control center and install an energy management system (EMS). Because hardware was being installed, it provided an opportunity to review the standards of performance demanded of the EMS and technological advances that could be utilized. As a result of this review, more rigorous reliability requirements were defined and a computer configuration designed to satisfy these requirements. The authors discuss the resulting performance standards, examine alternative architectures, and describe the computer architecture finally chosen for the EMS
Keywords :
computer architecture; load management; power system computer control; Canada; Ontario Hydro; computer architecture; energy management system; hardware; load management; performance standards; power system computer control; reliability; Computer architecture; Control systems; Energy management; Power generation; Power system control; Power system management; Power system protection; Power system security; Power system stability; Power systems;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.32581
Filename :
32581
Link To Document :
بازگشت