DocumentCode :
1181538
Title :
Risk and benefits assessment of long and short term capacity contract strategies
Author :
Trezos, Thanos
Author_Institution :
Southern California Edison Co., Rosemead, CA, USA
Volume :
4
Issue :
3
fYear :
1989
fDate :
8/1/1989 12:00:00 AM
Firstpage :
981
Lastpage :
987
Abstract :
A planning methodology is developed for purchasing firm capacity. The methodology evaluates the risk and benefits associated with long- and short-term capacity contracts. It facilitates the selection of a contract strategy that satisfies the capacity requirements of a utility company within its financial and operating constraints. In simplified form the issue addressed in this study is when a utility company should sign its next capacity contract, for how many megawatts, at what price, and for what duration
Keywords :
electricity supply industry; load management; power system planning; capacity contract; load management; planning; risk; utility; Contracts; Costs; Economic forecasting; Load forecasting; Multiprocessor interconnection networks; Power & Energy Society; Power engineering and energy; Power systems; Printing; Systems engineering and theory;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.32588
Filename :
32588
Link To Document :
بازگشت