DocumentCode :
1181557
Title :
Design and Controlled Use of Water Heater Load Management
Author :
Bischke, R.F. ; Sella, R.A.
Author_Institution :
Wisconsin Electric Power Company
Issue :
6
fYear :
1985
fDate :
6/1/1985 12:00:00 AM
Firstpage :
1290
Lastpage :
1293
Abstract :
Wisconsin Electric has been operating its Power Line Carrier Load Ma, nagement System for the past three years on a daily basis. The experiences gained in the actual operating environment have greatly influenced the Load Management strategies for the present and future. The operator confidence gained during this period of time has permitted a more sophisticated use of the system.
Keywords :
Business; Circuits; Control systems; Fuels; History; Load flow control; Load management; Substations; Temperature control; Water heating;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1985.319146
Filename :
4113224
Link To Document :
بازگشت