• DocumentCode
    1181718
  • Title

    A Practical Approach to an Interim Multi-Area Economic Dispatch Using Limited Computer Resources

  • Author

    Helmick, S.D. ; Shoults, R.R.

  • Author_Institution
    TEXAS UTILITIES
  • Issue
    6
  • fYear
    1985
  • fDate
    6/1/1985 12:00:00 AM
  • Firstpage
    1400
  • Lastpage
    1404
  • Abstract
    A straight foward and computationally efficient method is presented for calculating and sending "economic" Area Control Error(ACE) signals to three operating companies in the Texas Utilities(T.U.) System. The method requires T.U. system ACE and each operating company\´s total generation and then mathematically computes each area\´s desired generation. The difference between the desired generation and the actual generation for each area is it\´s economic ACE.
  • Keywords
    Aggregates; Computer errors; Control systems; Energy management; Error correction; Microcomputers; Power generation economics; Power system economics; Processor scheduling; System testing;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1985.319244
  • Filename
    4113242