Title :
Implementation of a Large-Scale Direct Load Control System-Some Critical Factors
Author_Institution :
Florida Power Corporation
fDate :
7/1/1985 12:00:00 AM
Abstract :
This paper describes several aspects of the implementation of a large-scale direct load control system. The need to maintain flexibility, and to carefully monitor critical variables affecting the overall implementation, is discussed. The existing Direct Load Control system at Florida Power Corporation is described, and factors relating to its integration to the bulk power supply operation are considered.
Keywords :
Automatic meter reading; Capacitive sensors; Costing; Hardware; Large-scale systems; Load flow control; Load forecasting; Monitoring; Power supplies; Spinning;
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
DOI :
10.1109/TPAS.1985.319196