• DocumentCode
    1183746
  • Title

    Parameters required to maximize a thermoset hydro-generator stator winding life. Part I-design, manufacture, installation

  • Author

    Lyles, John F. ; Goodeve, T. Earl ; Sedding, Howard

  • Author_Institution
    Ontario Hydro, Canada
  • Volume
    9
  • Issue
    3
  • fYear
    1994
  • fDate
    9/1/1994 12:00:00 AM
  • Firstpage
    620
  • Lastpage
    627
  • Abstract
    This paper describes the parameters required for a thermoset hydro-generator stator winding to achieve a service life of 50 years. Such parameters covering design, manufacture, installation, online monitoring and maintenance functions have been found to be relevant based on 36 years of design and operation experience. The database includes North American, European and Far Eastern hydro generators up to 20.5 kV-500 MVA. Parameters covered can be simply stated as design, installation and manufacture: the DIM rule
  • Keywords
    design engineering; electric breakdown of solids; hydroelectric generators; insulation testing; life testing; machine insulation; machine testing; maintenance engineering; manufacture; monitoring; stators; turbogenerators; 20.5 kV; 50 y; 500 MVA; DIM rule; database; design; hydroelectric generator; installation; maintenance; manufacture; online monitoring; operation experience; parameters; service life; stator winding; thermoset insulation life; Coils; Condition monitoring; Databases; Insulation; Pulp manufacturing; Rotating machines; Samarium; Stator windings; Stress; Voltage;
  • fLanguage
    English
  • Journal_Title
    Energy Conversion, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8969
  • Type

    jour

  • DOI
    10.1109/60.326483
  • Filename
    326483