Title : 
Parameters required to maximize a thermoset hydro-generator stator winding life. Part I-design, manufacture, installation
         
        
            Author : 
Lyles, John F. ; Goodeve, T. Earl ; Sedding, Howard
         
        
            Author_Institution : 
Ontario Hydro, Canada
         
        
        
        
        
            fDate : 
9/1/1994 12:00:00 AM
         
        
        
        
            Abstract : 
This paper describes the parameters required for a thermoset hydro-generator stator winding to achieve a service life of 50 years. Such parameters covering design, manufacture, installation, online monitoring and maintenance functions have been found to be relevant based on 36 years of design and operation experience. The database includes North American, European and Far Eastern hydro generators up to 20.5 kV-500 MVA. Parameters covered can be simply stated as design, installation and manufacture: the DIM rule
         
        
            Keywords : 
design engineering; electric breakdown of solids; hydroelectric generators; insulation testing; life testing; machine insulation; machine testing; maintenance engineering; manufacture; monitoring; stators; turbogenerators; 20.5 kV; 50 y; 500 MVA; DIM rule; database; design; hydroelectric generator; installation; maintenance; manufacture; online monitoring; operation experience; parameters; service life; stator winding; thermoset insulation life; Coils; Condition monitoring; Databases; Insulation; Pulp manufacturing; Rotating machines; Samarium; Stator windings; Stress; Voltage;
         
        
        
            Journal_Title : 
Energy Conversion, IEEE Transactions on