DocumentCode
1183746
Title
Parameters required to maximize a thermoset hydro-generator stator winding life. Part I-design, manufacture, installation
Author
Lyles, John F. ; Goodeve, T. Earl ; Sedding, Howard
Author_Institution
Ontario Hydro, Canada
Volume
9
Issue
3
fYear
1994
fDate
9/1/1994 12:00:00 AM
Firstpage
620
Lastpage
627
Abstract
This paper describes the parameters required for a thermoset hydro-generator stator winding to achieve a service life of 50 years. Such parameters covering design, manufacture, installation, online monitoring and maintenance functions have been found to be relevant based on 36 years of design and operation experience. The database includes North American, European and Far Eastern hydro generators up to 20.5 kV-500 MVA. Parameters covered can be simply stated as design, installation and manufacture: the DIM rule
Keywords
design engineering; electric breakdown of solids; hydroelectric generators; insulation testing; life testing; machine insulation; machine testing; maintenance engineering; manufacture; monitoring; stators; turbogenerators; 20.5 kV; 50 y; 500 MVA; DIM rule; database; design; hydroelectric generator; installation; maintenance; manufacture; online monitoring; operation experience; parameters; service life; stator winding; thermoset insulation life; Coils; Condition monitoring; Databases; Insulation; Pulp manufacturing; Rotating machines; Samarium; Stator windings; Stress; Voltage;
fLanguage
English
Journal_Title
Energy Conversion, IEEE Transactions on
Publisher
ieee
ISSN
0885-8969
Type
jour
DOI
10.1109/60.326483
Filename
326483
Link To Document