Parameters required to maximize a thermoset hydro-generator stator winding life. Part II-monitoring, maintenance
Author
Lyes, J.F. ; Goodeve, T. Earl ; Sedding, Howard
Author_Institution
Ontario Hydro, Canada
Volume
9
Issue
3
fYear
1994
fDate
9/1/1994 12:00:00 AM
Firstpage
628
Lastpage
635
Abstract
This paper describes the parameters required for a thermoset hydro-generator stator winding to achieve a service life of 50 years. Parameters covered are online monitoring and in-situ maintenance experience. These are the additional Ms of the DIM (design, installation, monitoring) rule
Keywords
electric breakdown of solids; hydroelectric generators; insulation testing; life testing; machine insulation; machine testing; maintenance engineering; monitoring; stators; turbogenerators; DIM rule; experience; hydroelectric generators; in-situ maintenance; online monitoring; service; stator winding; testing; thermoset insulation life; Condition monitoring; Data analysis; Insulation testing; Partial discharges; Pattern recognition; Rotating machines; Samarium; Stator windings; Surface discharges; System testing;
fLanguage
English
Journal_Title
Energy Conversion, IEEE Transactions on
Publisher
ieee
ISSN
0885-8969
Type
jour
DOI
10.1109/60.326484
Filename
326484
Link To Document