  • Title

    Parameters required to maximize a thermoset hydro-generator stator winding life. Part II-monitoring, maintenance

  • Author

    Lyes, J.F. ; Goodeve, T. Earl ; Sedding, Howard

  • Author_Institution
    Ontario Hydro, Canada
  • Volume
    9
  • Issue
    3
  • fYear
    1994
  • fDate
    9/1/1994 12:00:00 AM
  • Firstpage
    628
  • Lastpage
    635
  • Abstract
    This paper describes the parameters required for a thermoset hydro-generator stator winding to achieve a service life of 50 years. Parameters covered are online monitoring and in-situ maintenance experience. These are the additional Ms of the DIM (design, installation, monitoring) rule
  • Keywords
    electric breakdown of solids; hydroelectric generators; insulation testing; life testing; machine insulation; machine testing; maintenance engineering; monitoring; stators; turbogenerators; DIM rule; experience; hydroelectric generators; in-situ maintenance; online monitoring; service; stator winding; testing; thermoset insulation life; Condition monitoring; Data analysis; Insulation testing; Partial discharges; Pattern recognition; Rotating machines; Samarium; Stator windings; Surface discharges; System testing;
  • fLanguage
    English
  • Journal_Title
    Energy Conversion, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8969
  • Type

    jour

  • DOI
    10.1109/60.326484
  • Filename
    326484