Safety Considerations When Placing a Person with Tools in an Air Gap to Change Porcelain and Glass Insulators on Transmission Systems of 345 kV and above, Using Ladder and Aerial Lift Methods
Author
ESMOL Subcommittee
Volume
22
Issue
5
fYear
2002
fDate
5/1/2002 12:00:00 AM
Firstpage
71
Lastpage
71
Abstract
This paper provides general considerations for determining working clearances required to carry out live line barehand insulator change out work on energized power lines operating at 345 kV and above. It is intended to focus on a limited number of procedures and will only address one common structure configuration. This paper is intended to be used in conjunction with IEEE 516 Guide for Maintenance Methods on Energized Power Lines.
Keywords
Air safety; Circuit stability; Dielectrics and electrical insulation; Equipment failure; Ferroresonance; Flashover; Glass; Porcelain; RLC circuits; Voltage control;
fLanguage
English
Journal_Title
Power Engineering Review, IEEE
Publisher
ieee
ISSN
0272-1724
Type
jour
DOI
10.1109/MPER.2002.4312232
Filename
4312232
Link To Document