Title
Increasing the Power System Capacity of the 50 KV Black Mesa and Lake Powell Railroad Through Harmonic Filtering and Series Compensation
Author
Burke, J.J. ; Engel, A.P. ; Gilligan, S.R. ; Mincer, N.A.
Author_Institution
General Electric Co.
Issue
4
fYear
1979
fDate
7/1/1979 12:00:00 AM
Firstpage
1268
Lastpage
1274
Abstract
A 50 kV electrified railroad must be up-rated to double its hauling capacity without additional substations or transmission line. Careful analysis of the power supply requirements for rectifier drives produces a filtered, compensated system having more than twice the former capability. A transient network analyzer is used to evaluate the overall system and to model the train performance. Field measurements confirm the design expectations.
Keywords
Filtering; Lakes; Power harmonic filters; Power supplies; Power system analysis computing; Power system harmonics; Power transmission lines; Railway electrification; Substations; Transient analysis;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1979.319439
Filename
4113613
Link To Document