DocumentCode
1186863
Title
Investigation of Transmission and Distribution System Load Capabilities at Dallas Power & Light Company
Author
Parvin, D.G. ; Canon, David C. ; Dietzman, WBruce ; Putnam, J.L.
Author_Institution
Dallas Power & Light Company
Issue
2
fYear
1980
fDate
3/1/1980 12:00:00 AM
Firstpage
512
Lastpage
521
Abstract
Dallas Power & Light Company initiated a research project during the fall of 1976 to develop new emergency current ratings for the overhead and underground portions of its 13 kV distribution system. The main thrust of this project was a full scale testing program during the summers of 1977 and 1978. This paper contains the results of this testing program and the reasons for the research project itself.
Keywords
Conductors; Manufacturing; Power overhead lines; Power transmission lines; Substations; Switches; Switching circuits; Temperature; Testing; Transformers;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1980.319694
Filename
4113830
Link To Document