DocumentCode :
1187358
Title :
“First come, first served” can be unstable!
Author :
Seidman, Thomas I.
Author_Institution :
Dept. of Math. & Stat., Maryland Univ., Baltimore, MD, USA
Volume :
39
Issue :
10
fYear :
1994
fDate :
10/1/1994 12:00:00 AM
Firstpage :
2166
Lastpage :
2171
Abstract :
Considers flexible manufacturing systems using the “first come, first served” (FCFS or FIFO) scheduling policy at each machine. The authors describe and discuss in some detail simple deterministic examples which have adequate capacity but which, under FCFS, can exhibit instability; unboundedly growing WIP taking the form of a repeated pattern of behavior with the repetitions on an increasing scale
Keywords :
flexible manufacturing systems; production control; queueing theory; scheduling; FIFO; deterministic examples; first come first served; flexible manufacturing systems; instability; repeated pattern of behavior; scheduling policy; unboundedly growing work in progress; Adaptive control; Automatic control; Automatic generation control; Control systems; Error correction; Interconnected systems; Nonlinear control systems; Programmable control; Robust control; Stability;
fLanguage :
English
Journal_Title :
Automatic Control, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9286
Type :
jour
DOI :
10.1109/9.328805
Filename :
328805
Link To Document :
بازگشت