Abstract :
The results of Kema-tests with short-circuit currents with delayed zeros carried out on a Siemens SF6 circuit-breaker have been transferred into a digital computer program and applied upon the conditions in the Itaipu 550 kV-substation for various cases of faults near the generators. The most critical condition occurs when the generators have been operating in the underexited state followed by a three-phase non-simultaneous fault at the entrance of a line. Theoretically there might be only one line in service and 5 generators feeding through one breaker. The circuit-braker under investigation will even clear this fault without necessitating any tripping delay.
Keywords :
Circuit faults; Circuit testing; Delay; Fault currents; Protection; Sulfur hexafluoride; Switchgear; Thermal stresses; Turbines; Voltage;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1980.319563
Filename :
4113946
Link To Document :
بازگشت