DocumentCode :
1196265
Title :
A fast technique for unit commitment problem by extended priority list
Author :
Senjyu, Tomonobu ; Shimabukuro, Kai ; Uezato, Katsumi ; Funabashi, Toshihisa
Author_Institution :
Dept. of Electr. & Electron. Eng., Univ. of the Ryukyus, Okinawa, Japan
Volume :
18
Issue :
2
fYear :
2003
fDate :
5/1/2003 12:00:00 AM
Firstpage :
882
Lastpage :
888
Abstract :
This paper introduces a new unit commitment problem, adapting extended priority list (EPL) method. The EPL method consists of two steps, in the first step we get rapidly some initial unit commitment problem schedules by priority list (PL) method. At this step, operational constraints are disregarded. In the second step unit schedule is modified using the problem specific heuristics to fulfill operational constraints. To calculate efficiently, however, note that some heuristics applied only to solutions can expect improvement. Several numerical examples demonstrate the effectiveness of proposed method.
Keywords :
power generation scheduling; power system planning; extended priority list; heat rate; operational constraints; power system operation; power system planning; problem specific heuristics; unit commitment problem; Costs; Economic forecasting; Large-scale systems; Page description languages; Power generation economics; Power industry; Power supplies; Power system planning; Power systems; Scheduling;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/TPWRS.2003.811000
Filename :
1198328
Link To Document :
بازگشت