  • Title

    A 50 Hz dipole magnet for the TRIUMF KAON factory booster ring

  • Author

    Otter, A.J.

  • Author_Institution
    TRIUMF, Vancouver, BC, Canada
  • Volume
    28
  • Issue
    1
  • fYear
    1992
  • fDate
    1/1/1992 12:00:00 AM
  • Firstpage
    524
  • Lastpage
    527
  • Abstract
    The 3-GeV booster synchrotron for TRIUMF´s KAON Factory will need 24 dipole magnets each 3.0-m long operating with a resonant power system designed to give a 50-Hz AC field superimposed onto a DC field. The maximum and minimum field levels are 1.118 and 0.295 T, respectively. The magnet design is presented and compared with measured results from a prototype which was constructed to evaluate fabrication procedures and to verify the AC loss calculations. The experiences gained from this fabrication are described. The prototype magnet measured parameters were very close to the design values, giving confidence in the methods of calculation and fabrication techniques. The prototype also served as a test of the power supply and its components and highlighted some of the control aspects that must be incorporated for a working synchrotron ring
  • Keywords
    beam handling equipment; eddy current losses; electromagnets; proton accelerators; synchrotrons; 0.295 to 1.118 T; 3 GeV; 3 m; 50 Hz; AC field; AC loss; DC field; TRIUMF KAON factory booster ring; booster synchrotron; dipole magnets; magnet design; power supply; proton accelerator; resonant power system; synchrotron ring; Fabrication; Loss measurement; Magnetic field measurement; Magnetic resonance; Mesons; Power system measurements; Production facilities; Prototypes; Synchrotrons; Testing;
  • fLanguage
    English
  • Journal_Title
    Magnetics, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9464
  • Type

    jour

  • DOI
    10.1109/20.119927