DocumentCode :
120292
Title :
A Bi-level Programming to Two-Stage Transportation Planning Problem
Author :
Cuiying Feng ; Ling Nie
Author_Institution :
Uncertainty Decision-Making Lab. Bus. Sch., Sichuan Univ., Chengdu, China
fYear :
2014
fDate :
4-6 July 2014
Firstpage :
616
Lastpage :
620
Abstract :
This paper presents an extension of the two-stage transportation planning problem for a large scale hydropower construction project where bi-level programming and a balance of the satisfactory degree between decision makers are considered. For solving the complex and non-linear bilevel programming model, an interactive fuzzy programming technique and a particle swarm optimization with passive congregation algorithm are designed as a combined solution approach. Finally, the results and analysis of a practical example are presented to demonstrate the practicality and efficiency of the proposed model and optimization method.
Keywords :
construction industry; decision making; fuzzy set theory; hydroelectric power; nonlinear programming; particle swarm optimisation; planning; project management; transportation; bi-level programming; complex bilevel programming model; decision makers; interactive fuzzy programming technique; large scale hydropower construction project; nonlinear bilevel programming model; particle swarm optimization; passive congregation algorithm; satisfactory degree; two-stage transportation planning problem; Companies; Linear programming; Materials; Planning; Programming profession; Transportation; bi-level programming; interactive fuzzy programming; particle swarm optimization; two-stage transportation planning;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computational Sciences and Optimization (CSO), 2014 Seventh International Joint Conference on
Conference_Location :
Beijing
Print_ISBN :
978-1-4799-5371-4
Type :
conf
DOI :
10.1109/CSO.2014.127
Filename :
6923760
Link To Document :
بازگشت