DocumentCode
1209801
Title
Strategies for acquiring and building integrated CAE systems
Author
Schofield, Norman A.
Author_Institution
PA Management Consultants, Cambridge Laboratory, Royston, UK
Volume
2
Issue
1
fYear
1985
fDate
2/1/1985 12:00:00 AM
Firstpage
24
Lastpage
29
Abstract
The first realisation in planning the development of a large-scale integrated CAE system is that it must be dealt with on a corporate basis and not departmentally. The overall aim should be to lay down a corporate strategy with a time frame of at least five years, to understand the long-term benefits and most importantly to stick to it. Within this strategy it is then feasible to take on appropriate subsystems to satisfy particular objectives ¿¿ some will have immediate benefits while others have no intrinsic value but will be vital building blocks for the achievement of the integrated whole. This paper aims to provide the visionary managing director with the necessary confidence to see his vision through to completion.
Keywords
CAD/CAM; management; building blocks; corporate basis; development; integrated CAE systems; planning; subsystems; time frame; visionary managing director;
fLanguage
English
Journal_Title
Computer-Aided Engineering Journal
Publisher
iet
ISSN
0263-9327
Type
jour
DOI
10.1049/cae.1985.0005
Filename
4806474
Link To Document