DocumentCode
1218647
Title
Supply Shortage Hedging: Estimating the Electrical Power Margin for Optimizing Financial and Physical Assets With Chance-Constrained Programming
Author
Zorgati, Riadh ; Van Ackooij, Wim ; Apparigliato, Romain
Author_Institution
Dept. of Optimization, Simulation, Risk, & Stat., EDF R&D, Clamart
Volume
24
Issue
2
fYear
2009
fDate
5/1/2009 12:00:00 AM
Firstpage
533
Lastpage
540
Abstract
This paper deals with estimating the maximal production capacity of a hydrothermal system. We will show why this is of interest and how such a problem arises in a context of hedging against supply shortage, using financial and physical assets. Therefore, we will formulate the supply shortage hedging as a stochastic optimization problem with chance constraints and show on an example why introducing physical assets in the hedging problem is of economical interest. We then highlight the inherent mathematical difficulties, introduced by optimizing physical assets. Using maximal production capacities of the hydrothermal system improves tractability of the hedging problem. However, focusing on the hydraulic production maximal capacity, we illustrate the combinatorial and nontrivial nature of this subproblem. Finally, we show how our problem formulation may lead to embedded chance constraints.
Keywords
hydrothermal power systems; optimisation; power generation economics; power generation reliability; power supply quality; stochastic processes; chance-constrained programming; electrical power margin; financial assets; hydraulic production maximal capacity; hydrothermal system; maximal production capacities; physical assets; stochastic optimization problem; supply shortage hedging; Chance-constrained programming (CCP); hedging; hydraulic maximal capacity; mixed-integer programming; power margin; supply shortage; unit commitment;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/TPWRS.2009.2016586
Filename
4808237
Link To Document