    Inclusion of the Time Factor in Comparing the Costs of Terrestrial Telecommunication Transmission Systems

  • Author

    Swensen, Robert D. ; Montie, Kitty A.

  • Author_Institution
    Communications Satellite Corp.,Washington,DC
  • Volume
    19
  • Issue
    5
  • fYear
    1971
  • fDate
    10/1/1971 12:00:00 AM
  • Firstpage
    612
  • Lastpage
    618
  • Abstract
    The traditional figure of merit in comparing the economics of telecommunication transmission systems has been the annual cost per voice-circuit mile at full capacity. While this is a useful measure in some types of comparisons, it does not provide a particularly meaningful measure of the costs borne by the users of a transmission system. The users are expected to pay the average costs. The average cost per voice-circuit mile provided by a transmission system is very sensitive to starting circuit requirements and the rate of growth in these requirements. The large cross section system can only be economical on routes with high starting circuit requirements and/or high growth rates. Lower capacity systems may be considerably more economical on routes with modest requirements. This paper investigates the annual costs of three modern transmission systems; TD-3, L-4 (20 tube), and L-5 (22 tube). Annual costs for each year and average annual costs for the program period are calculated and plots of the sensitivity of these costs to variations in the input assumptions are provided.
  • Keywords
    Biographies; Circuits; Communications technology; Cost function; Investments; Particle measurements; Psychology; Spectroscopy; Speech; Time factors;
  • fLanguage
    English
  • Journal_Title
    Communication Technology, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9332
  • Type

    jour

  • DOI
    10.1109/TCOM.1971.1090737
  • Filename
    1090737