DocumentCode
1231567
Title
On time-optimal control of a sequence of projects of activities under time-variable resource
Author
Janiak, Adam ; Stankiewicz, Anna
Author_Institution
Inst. of Eng. Cybern., Tech. Univ. of Wroclaw, Poland
Volume
33
Issue
3
fYear
1988
fDate
3/1/1988 12:00:00 AM
Firstpage
313
Lastpage
316
Abstract
A sequence of k projects of independent activities, each project composed of activities available for realization at the same time, is considered. It is assumed that the activities are continuous dynamical systems with dynamics that depend continuously on the alloted amounts of the resource and that the initial and terminal states are fixed. The problem is to allocate the time-variable renewable, continuously divisible resource (e.g. power, fuel flow, approximate manpower) to the activities in order to minimize the performance time of the sequence of projects. A solution is presented that is based on the notion of the set of reachable states under the assumption that the allowable level of the total usage of the resource is piecewise constant. Necessary and sufficient optimality conditions are stated in terms of the performance time, and the existence of the optimal control is proved. An algorithm for the time optimal control is proved. An algorithm for the time-optimal resource allocation is derived and an example is given to illustrate the approach
Keywords
management; operations research; optimal control; project engineering; continuous dynamical systems; continuously divisible resource; management; operations research; project activity sequences; reachable states; sufficient optimality; time variable renewable resource; time-optimal control; time-variable resource; Automatic control; Availability; Continuous time systems; Control systems; Cost function; Cybernetics; Fuels; Optimal control; Resource management; Time factors;
fLanguage
English
Journal_Title
Automatic Control, IEEE Transactions on
Publisher
ieee
ISSN
0018-9286
Type
jour
DOI
10.1109/9.413
Filename
413
Link To Document