DocumentCode :
1235055
Title :
Finite automata decomposition for flexible manufacturing systems control and scheduling
Author :
Darabi, Houshang ; Jafari, Mohsen A. ; Manapure, Shomit S.
Author_Institution :
Dept. of´´ Mech. & Ind. Eng., Illinois Univ., Chicago, IL, USA
Volume :
33
Issue :
2
fYear :
2003
fDate :
5/1/2003 12:00:00 AM
Firstpage :
168
Lastpage :
175
Abstract :
Despite the efforts in scheduling and control of flexible manufacturing systems (FMSs) with resource constraints, the current pool of scheduling techniques faces two major drawbacks: modeling and complexity. Modeling is the task of converting the FMS data to a set of information, ready to be processed by a scheduling algorithm. Complexity has a direct relation with the amount of effort required to execute a scheduling algorithm successfully on the information set generated in the modeling phase. In this paper, we use finite automata (FA) theory to develop a modeling formalism and its accompanying scheduling algorithm for control and scheduling of FMS with resource constraints. While the FA-based modeling is completely automatic and does not need any human-designer interference, its related algorithm is both effective and efficient. We use IDEF3 standard to capture the FMS activities and resource data. We propose a three-step procedure. In the first step, the IDEF3 data set is converted to a finite automaton, preserving the activity precedence relationships. In the second step, the resulted finite automaton is decomposed to smaller (in size) scheduling problems that can be independently optimized. In the third step, a heuristic scheduling algorithm is used to handle each problem separately. We applied the developed procedure to 100 problems. The results are satisfactory and promising.
Keywords :
finite automata; flexible manufacturing systems; production control; FA; FMS complexity; FMS modeling; FMS scheduling; IDEF3 standard; activity precedence relationships; finite automata; finite automata decomposition; flexible manufacturing system control; heuristic scheduling algorithm; human-designer interference; resource constraints; Automata; Automatic control; Control systems; Flexible manufacturing systems; Humans; Interference constraints; Job shop scheduling; Manufacturing industries; Manufacturing systems; Scheduling algorithm;
fLanguage :
English
Journal_Title :
Systems, Man, and Cybernetics, Part C: Applications and Reviews, IEEE Transactions on
Publisher :
ieee
ISSN :
1094-6977
Type :
jour
DOI :
10.1109/TSMCC.2003.813149
Filename :
1211124
Link To Document :
بازگشت