• DocumentCode
    1235879
  • Title

    Development of a closed AC 2000 kV testing facility

  • Author

    Ohki, Y.

  • Author_Institution
    Waseda Univ., Tokyo, Japan
  • Volume
    5
  • Issue
    4
  • fYear
    1989
  • Firstpage
    20
  • Lastpage
    21
  • Abstract
    A description is given of a recently completed facility for testing cross-linked polyethylene insulated cables (CV cables). The main body of the facility is an AC 2000 kV transformer. A closed SF/sub 6/ gas-insulated (GIL) bus connects to it, and a testing cable is slipped onto its edge. A standard capacitor connects to the GIL to measure the tan delta of the testing cable. The facility adopts a new insulation design that is different from conventional technology in many ways. It has proved to be capable of testing breakdowns in 275- and 500-kV CV cables. The advantages of the facility are enumerated.<>
  • Keywords
    cable insulation; cable testing; dielectric loss measurement; high-voltage techniques; insulation testing; loss-angle measurement; organic insulating materials; polymers; power cables; test facilities; 2 MV; 275 kV; 500 kV; AC transformer; GIL; SF/sub 6/; UHV cables; XLPE; closed gas-insulated bus; cross-linked polyethylene insulated cables; insulation design; loss tangent; standard capacitor; testing facility; Capacitors; Current transformers; Gas insulated transmission lines; Insulators; Joining processes; Oil filled cables; Oil insulation; Power transformer insulation; Testing; Wire;
  • fLanguage
    English
  • Journal_Title
    Electrical Insulation Magazine, IEEE
  • Publisher
    ieee
  • ISSN
    0883-7554
  • Type

    jour

  • DOI
    10.1109/57.35600
  • Filename
    35600