How to Avoid Selecting Bids Based on Overoptimistic Cost Estimates
Author
Jorgensen, Magne
Author_Institution
Simula Res. Lab., Oslo
Volume
26
Issue
3
fYear
2009
Firstpage
79
Lastpage
84
Abstract
This article documents important connections between cost overruns and bidding. It also recommends how clients should design their bidding process to avoid selecting bids based on overoptimistic cost estimates. The recommendations provided reduce the risk of initiating projects that have unrealistic plans, time overruns, low software quality, high maintenance costs, and inflexible providers. Although this article aims to improve the clients´ bidding processes, the authos believes that it also has important implications for software providers. They could use the reported results to identify bidding rounds that they´re likely to win only if they provide a bid based on strongly overoptimistic cost estimates. Software providers should consider carefully whether it´s worthwhile to participate in bidding rounds in which this is the case.
Keywords
software cost estimation; software maintenance; bidding; maintenance costs; overoptimistic cost estimates; software providers; software quality; Context awareness; Cost function; Programming; Project management; Proposals; Software engineering; Uncertainty; Writing; bidding processes; cost estimation; provider selection; software acquisition;
fLanguage
English
Journal_Title
Software, IEEE
Publisher
ieee
ISSN
0740-7459
Type
jour
DOI
10.1109/MS.2009.71
Filename
4814964
Link To Document