• DocumentCode
    1240213
  • Title

    How to Avoid Selecting Bids Based on Overoptimistic Cost Estimates

  • Author

    Jorgensen, Magne

  • Author_Institution
    Simula Res. Lab., Oslo
  • Volume
    26
  • Issue
    3
  • fYear
    2009
  • Firstpage
    79
  • Lastpage
    84
  • Abstract
    This article documents important connections between cost overruns and bidding. It also recommends how clients should design their bidding process to avoid selecting bids based on overoptimistic cost estimates. The recommendations provided reduce the risk of initiating projects that have unrealistic plans, time overruns, low software quality, high maintenance costs, and inflexible providers. Although this article aims to improve the clients´ bidding processes, the authos believes that it also has important implications for software providers. They could use the reported results to identify bidding rounds that they´re likely to win only if they provide a bid based on strongly overoptimistic cost estimates. Software providers should consider carefully whether it´s worthwhile to participate in bidding rounds in which this is the case.
  • Keywords
    software cost estimation; software maintenance; bidding; maintenance costs; overoptimistic cost estimates; software providers; software quality; Context awareness; Cost function; Programming; Project management; Proposals; Software engineering; Uncertainty; Writing; bidding processes; cost estimation; provider selection; software acquisition;
  • fLanguage
    English
  • Journal_Title
    Software, IEEE
  • Publisher
    ieee
  • ISSN
    0740-7459
  • Type

    jour

  • DOI
    10.1109/MS.2009.71
  • Filename
    4814964