Title :
A simplified method of evaluating PERT/CPM network parameters
Author :
Zhu, Zhiwei ; Heady, Ronald B.
Author_Institution :
Dept. of Manage. & Quantitative Methods, Univ. of Southwestern Louisiana, Lafayette, LA, USA
Volume :
41
Issue :
4
fYear :
1994
fDate :
11/1/1994 12:00:00 AM
Firstpage :
426
Lastpage :
430
Abstract :
A simplified method of finding PERT/CPM critical paths, project durations, and slack times is described. This method is not a replacement for the standard computer algorithms. Instead, it offers a simple procedure for manually finding the critical project parameters that is suitable for teaching the principles to both technical and nontechnical users. It combines the best aspects of existing methods to form a tabular method that maintains a visual component. Experience shows that it is sufficiently intuitive that it can be learned without the need for an instructor, even though it is rigorously founded on the principle of optimality. A computer code is included to further illustrate the method
Keywords :
PERT; critical path analysis; engineering computing; project management; simulation; PERT; PERT/CPM critical paths; PERT/CPM network parameters; computer code; critical path method; critical project parameters; nontechnical users; project durations; slack times; teaching; technical users; Computer networks; Education; Engineering management; Helium; Production; Project management; Research and development management;
fLanguage :
English
Journal_Title :
Engineering Management, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9391
Type :
jour
DOI :
10.1109/17.364568
Filename :
364568
Link To Document :
بازگشت