Abstract
A simplified method of finding PERT/CPM critical paths, project durations, and slack times is described. This method is not a replacement for the standard computer algorithms. Instead, it offers a simple procedure for manually finding the critical project parameters that is suitable for teaching the principles to both technical and nontechnical users. It combines the best aspects of existing methods to form a tabular method that maintains a visual component. Experience shows that it is sufficiently intuitive that it can be learned without the need for an instructor, even though it is rigorously founded on the principle of optimality. A computer code is included to further illustrate the method
Keywords
PERT; critical path analysis; engineering computing; project management; simulation; PERT; PERT/CPM critical paths; PERT/CPM network parameters; computer code; critical path method; critical project parameters; nontechnical users; project durations; slack times; teaching; technical users; Computer networks; Education; Engineering management; Helium; Production; Project management; Research and development management;
fLanguage
English
Journal_Title
Engineering Management, IEEE Transactions on
Publisher
ieee
ISSN
0018-9391
Type
jour
DOI
10.1109/17.364568
Filename
364568
Link To Document