DocumentCode :
1247023
Title :
Good as new
Author :
Jordan, Robert S. ; Schaefer, Richard C. ; Estes, J.A. ; Dube, Michael R.
Author_Institution :
Weyerhaeuser Eng. Services, Charlotte, NC, USA
Volume :
11
Issue :
2
fYear :
2005
Firstpage :
31
Lastpage :
38
Abstract :
This work describes the process involved in evaluating whether or not to reuse the generator´s original compound excitation system and, if replaced, the type of excitation system that should be installed: compound or potential bus-fed type. It was determined that installing a used steam turbine generator at the plant would be a viable way to reduce manufacturing costs. This work discusses the issues encountered during the evaluation process, the expectations desired, the decisions made, and the outcome achieved as a result of the final decision to replace the existing compound excitation system with a potential bus-fed excitation system.
Keywords :
cost reduction; maintenance engineering; turbogenerators; compound excitation type; cost reduction; generator excitation system; potential bus-fed excitation type; steam turbine generator replacement; Boilers; Costs; Heart rate; Manufacturing processes; Petroleum; Power generation economics; Power industry; Pulp manufacturing; Switchgear; Turbines;
fLanguage :
English
Journal_Title :
Industry Applications Magazine, IEEE
Publisher :
ieee
ISSN :
1077-2618
Type :
jour
DOI :
10.1109/MIA.2005.1405824
Filename :
1405824