DocumentCode :
1248836
Title :
Maximizing accuracy in large data conversions
Author :
Pantano, Paul J.
Author_Institution :
Comput. Sci. Corp., MD, USA
Volume :
1
Issue :
5
fYear :
1999
Firstpage :
30
Lastpage :
36
Abstract :
Data conversion looks easy to a lot of people. It´s not-particularly if it´s a large project. There are just too many ways things can go wrong. You can lose data or mess it up. And you can stall the conversion if you don´t have enough computing resources. Project size really makes a difference. Some type of mapping tool can improve your chances for success because the data in the specification is the same data that drives the program that loads the target tables. Automation eliminated the mistakes that cause inconsistency. The tools and processes we developed on a large project worked well on a smaller project, but the reverse certainly would not have been true. A systematic process is required with some way to validate each step
Keywords :
DP management; data conversion; data integrity; project management; systems re-engineering; accuracy; inconsistency; large data conversions; large project; mapping tool; specification; validation; Asset management; Corporate acquisitions; Data conversion; Distributed computing; Logistics; Manuals; Relational databases; Software testing; Supply chains; Warehousing;
fLanguage :
English
Journal_Title :
IT Professional
Publisher :
ieee
ISSN :
1520-9202
Type :
jour
DOI :
10.1109/6294.793668
Filename :
793668
Link To Document :
بازگشت