Title :
Optimal Operations Planning in a Large Hydro-Thermal Power System
Author :
Sjelvgren, Denis ; Andersson, Stig ; Andersson, Tord ; Nyberg, Ulf ; Dillon, T.S.
Author_Institution :
Swedish State Power Board Stockholm, Sweden
Keywords :
Cost function; Law; Legal factors; Power system modeling; Power system planning; Production planning; Production systems; Reservoirs; Rivers; Stochastic processes;
Journal_Title :
Power Engineering Review, IEEE
DOI :
10.1109/MPER.1983.5520208