Title : 
Equipment Qualification ??? The Process for New Plants as Seen by a Utility
         
        
            Author : 
Porter, Newell S.
         
        
            Author_Institution : 
Washington Public Power Supply System, Richland, WA
         
        
        
        
            fDate : 
7/1/1984 12:00:00 AM
         
        
        
        
            Keywords : 
Contracts; Degradation; Industrial accidents; Inspection; Laboratories; Load flow control; Maintenance engineering; Proposals; Qualifications; Quality assurance; Reliability; Safety devices; Standards development; Testing; Transceivers;
         
        
        
            Journal_Title : 
Power Engineering Review, IEEE
         
        
        
        
        
            DOI : 
10.1109/MPER.1984.5525877