  • Abstract
    This paper presents the regulatory review process for seismic and dynamic qualification of safety-related electrical and mechanical equipment in nuclear power plant design, and highlights those areas that need careful attention in a qualification program. Qualification requirements as embodied in the General Design Criterion 2, Appendix A to the Code of Federal Regulations (CFR) 10 Part 50, VI(a) (1) and (2) of Appendix A to 10 CFR Part 100, and the Standard Review Plan Section 3.10 are reviewed. In addition, the review procedure of seismic qualification review team (SQRT) is described. In the past years of SORT review of near term operating license (NTOL) plants, some problem areas have been identified regarding applicant´s equipment seismic and dynamic qualification programs. In this paper, the problem areas which are of generic nature are discussed. Among the areas covered are: shake-table input wave forms, consideration of hydrodynamic loads, sequential testing procedure, surveillance and maintenance program, fatigue cycling effects, qualification of mechanical equipment, site-specific earthquakes, auditability of qualification documents, update of final safety analysis report and documentation filing system.
  • Keywords
    Code standards; Fatigue; Hydrodynamics; Licenses; Nuclear facility regulation; Power generation; Qualifications; Sequential analysis; Surveillance; System testing;
  • fLanguage
    English
  • Journal_Title
    Power Engineering Review, IEEE
  • Publisher
    ieee
  • ISSN
    0272-1724
  • Type

    jour

  • DOI
    10.1109/MPER.1984.5525880
  • Filename
    5525880