• DocumentCode
    1261617
  • Title

    Abridgment of the electrolytic zinc plant of the Sullivan Mining company

  • Author

    Fosdick, Ellery R.

  • Author_Institution
    The Washington Water Power Co., Spokane, Wash.
  • Volume
    47
  • Issue
    11
  • fYear
    1928
  • Firstpage
    808
  • Lastpage
    811
  • Abstract
    This paper describes the recently constructed electrolytic zinc plant of the Sullivan Mining Company, located near Kellogg, Idaho. The first unit which has just been completed has a capacity of 50 tons of slab zinc per day. Provision has been made for two additional units which will bring the capacity up to 150 tons per day. The “Tainton-Pring” electrolytic process, which uses strong acid for leaching and high-current density for electrolysis, is employed in this plant. The metallurgical process and the physical layout of the plant are briefly described, after which there follows a general discussion of the electrical features.
  • fLanguage
    English
  • Journal_Title
    A.I.E.E., Journal of the
  • Publisher
    ieee
  • ISSN
    0095-9804
  • Type

    jour

  • DOI
    10.1109/JAIEE.1928.6534941
  • Filename
    6534941