• DocumentCode
    1261642
  • Title

    Abridgment of the gould street generating station of the consolidated gas, electric light and power company

  • Author

    Loizeaux, A.S.

  • Author_Institution
    Consolidated Gas, Electric Light & Power Co., Baltimore, Md.
  • Volume
    47
  • Issue
    11
  • fYear
    1928
  • Firstpage
    823
  • Lastpage
    827
  • Abstract
    The paper is descriptive of the Gould St. Plant. Pulverized coal is prepared in a separate building. Only one boiler is provided per turbine, each boiler delivering a maximum of 520,000 lb. of steam per hour. Automatic control is provided for the electric drive of boiler auxiliaries, electric auxiliaries being used throughout the plant; a 250-volt exciter and 460-volt house turbine are on main generator shaft. Switch house is of isolated phase construction with vertical operation of switches. Actual costs are given for the first unit, with estimated costs for completed plant, resulting in costs for the completed plant of $88 per kw. for normal output and $80 per kw. for maximum output.
  • fLanguage
    English
  • Journal_Title
    A.I.E.E., Journal of the
  • Publisher
    ieee
  • ISSN
    0095-9804
  • Type

    jour

  • DOI
    10.1109/JAIEE.1928.6534945
  • Filename